Local Project

Local Project
Snapshot

 

LOCAL INDUSTRY PROJECTS

Recent Projects

Industry Project Title Focus

# of Faculty

Students *

Air Handling Equip Assy Safety Program Development Safety, Human Factors

1

2 U.G

Battery Manufacturing Methods and Time Studies for Industrial Battery Mfg Methods, Time Standards

1

1 G

1 U.G

Cable Assembly Cost Benefit Analysis of Process Reorganization Cost Standards

1

1 G

Cable Assembly Custom Material Handling for Wire Harness Assembly Material Handling Design

1

1 G

Contract Machining Facilities Layout for Custom Machining and Assembly Layout Planning

1

10 U.G

Corrugated Paper Mfg. Spare Parts Identification and Control Inventory Control

1

2 U.G

Furniture Manufacturing Time Standard for Repack Predetermined Motion Time Systems

1

1 G

Garage Door Distribution Improvement of Garage Door Center Methods, Layout Planning

1

2 U.G

Heavy Trailer Assembly Process Analysis and Improved Layout Design Methods, Layout Planning

1

1 G

Hosiery Manufacturing Warehouse Operations Improvement Layout Planning

1

2 U.G

Lighting Assy and Distrib. Potential Locations for Distribution Center Optimization

1

1 G

Manufactured Homes Configuring Loads for Transportation of Mfg Homes Optimization, Auto-id

2

1 G

Metal Finishing Methods Study and New Facility Layout Methods, Layout Planning

1

1 U.G

Sheet Metal Pass. Cost Estimation Tool for Job Shop Cost Estimation

1

1 G

Sheltered Mfg Workshop ISO 9000 Documentation for Non-Profit Facility Quality Assurance

1

6 U.G

Solder Production Work Process Reengineering Methods, Cost Benefits

1

1 G

Tubular Steel Fabricating Methods and Time Study Development for Metal Fab Methods, Time Standards

1

2 U.G

* G Graduate; U.G Undergraduate

 

 

 

Home Next