| Industry
|
Project Title |
Focus
|
#
of
Faculty
|
Students
*
|
| Air
Handling Equip Assy
|
Safety
Program Development
|
Safety,
Human Factors
|
1
|
2
U.G
|
| Battery
Manufacturing
|
Methods
and Time Studies for Industrial Battery Mfg
|
Methods,
Time Standards
|
1
|
1
G
1
U.G
|
| Cable
Assembly
|
Cost
Benefit Analysis of Process Reorganization
|
Cost
Standards
|
1
|
1
G
|
| Cable
Assembly
|
Custom
Material Handling for Wire Harness Assembly
|
Material
Handling Design
|
1
|
1
G
|
| Contract
Machining
|
Facilities
Layout for Custom Machining and Assembly
|
Layout
Planning
|
1
|
10
U.G
|
| Corrugated
Paper Mfg.
|
Spare
Parts Identification and Control
|
Inventory
Control
|
1
|
2
U.G
|
| Furniture
Manufacturing
|
Time
Standard for Repack
|
Predetermined
Motion Time Systems
|
1
|
1
G
|
| Garage
Door Distribution
|
Improvement
of Garage Door Center
|
Methods,
Layout Planning
|
1
|
2
U.G
|
| Heavy
Trailer Assembly
|
Process
Analysis and Improved Layout Design
|
Methods,
Layout Planning
|
1
|
1
G
|
| Hosiery
Manufacturing
|
Warehouse
Operations Improvement
|
Layout
Planning
|
1
|
2
U.G
|
| Lighting
Assy and Distrib.
|
Potential
Locations for Distribution Center
|
Optimization
|
1
|
1
G
|
| Manufactured
Homes
|
Configuring
Loads for Transportation of Mfg Homes
|
Optimization,
Auto-id
|
2
|
1
G
|
| Metal
Finishing
|
Methods
Study and New Facility Layout
|
Methods,
Layout Planning
|
1
|
1
U.G
|
| Sheet
Metal Pass.
|
Cost
Estimation Tool for Job Shop
|
Cost
Estimation
|
1
|
1
G
|
| Sheltered
Mfg Workshop
|
ISO
9000 Documentation for Non-Profit Facility
|
Quality
Assurance
|
1
|
6
U.G
|
| Solder
Production
|
Work
Process Reengineering
|
Methods,
Cost Benefits
|
1
|
1
G
|
| Tubular
Steel Fabricating
|
Methods
and Time Study Development for Metal Fab
|
Methods,
Time Standards
|
1
|
2
U.G
|