Picture of two physical plant workers in the field of work outside of their equipment truck

DEPARTMENTS

RENOVATION PROJECTS

Once a work request for the project is received, we assess it to determine if the scope of work can be accomplished with in-house resources. If the scope exceeds it, a project manager will be assigned to determine the scope of work and hires an outside coordinator.

Name Position Email Phone
Waymond Blackmon Engineering Tech. waymond@ncat.edu 336.285.4523
David Lennon Engineering Tech. lennond@ncat.edu 336.285.4527
Robert Routh Facilities Superintendent rrouth@ncat.edu 336.285.4597
Todd Baldwin Engineer ttbaldwi@ncat.edu 336.285.4581

_________________________________________________________________________

Points of Pride